SORT PROJECTS:

SHOW ALL

Waipapa Marae Refurbishment

Refurbishment to both Whare Nui and Whare Kai. 

MSD – Service Centres for the Future

Fit-out of office Service Centres.

Edgewater Village

4 Blocks consisting of a mix of 70 one and two bedroom serviced apartments and care units…

Renal Dialysis Unit – North Shore Hospital

A single level, 24 bed, ‘state of the art’ facility for out-patients in need of renal dialysis at North Shore Hospital…

Ormiston Medical Centre

The project involves the construction of a three-storey base build medical centre including associated services and coordination with Vector and Chorus, civil, carpark and landscaping works…

Ormiston Hospital Pre-Op Reconfiguration

Kalmar Interiors was awarded the project to make improvements to the pre-operation preparation areas in the existing Ormiston Hospital…

Carpark Building at Fred Thomas

Construction of a 4 level multi-storey car park with retail units at ground level…

Sheppard Industries

Kalmar led the development of an 8,000 square metre warehouse and high-tech office fit-out for New Zealand’s leading supplier of bicycles, wheels and castors…

F-A-B-R-I-C of Spring Street

118 Residential apartments across two 6-level buildings each finished with landscaped areas over an elevated podium.

Remuera Gardens Stage 1

Fifty-eight retirement apartments spread over two five storey buildings.

Onehunga Mall Club

Eight-storey building with two levels of car parking and 102 apartments over six levels.  Apartments are one and two bedroom units.  There are two retail units on the ground floor.

Proxima Residences

Sixty-four apartments over seven floors.

The Foundation Project – Building 1

A new, multi-storey retirement living complex built to a high level of specification and finish.

Te Uru Apartments Stage 8

Three buildings comprising 72 residential apartments.  The building facades are brick with some profiled metal cladding.

Oakridge Care

65 Care Suites with cafe and amenities for Oakridge residents.

Edgewater Village

4 Blocks consisting of a mix of 70 one and two bedroom serviced apartments and care units…

Renal Dialysis Unit – North Shore Hospital

A single level, 24 bed, ‘state of the art’ facility for out-patients in need of renal dialysis at North Shore Hospital…

Ormiston Medical Centre

The project involves the construction of a three-storey base build medical centre including associated services and coordination with Vector and Chorus, civil, carpark and landscaping works…

Ormiston Hospital Pre-Op Reconfiguration

Kalmar Interiors was awarded the project to make improvements to the pre-operation preparation areas in the existing Ormiston Hospital…

Bays Health – Brown Bays Medical Centre

Refurbishment of old RSA building…

Remuera Gardens Stage 1

Fifty-eight retirement apartments spread over two five storey buildings.

Onehunga Mall Club

Eight-storey building with two levels of car parking and 102 apartments over six levels.  Apartments are one and two bedroom units.  There are two retail units on the ground floor.

Proxima Residences

Sixty-four apartments over seven floors.

The Foundation Project – Building 1

A new, multi-storey retirement living complex built to a high level of specification and finish.

Ovation Apartments

Seven level high-end residential apartment building, comprising 19 apartments over one and a half basement levels…

The Marlborough

Located at 2 Launch Road, “The Marlborough” is a glamourous 6 storey residential apartment building comprising a mix of 39 one, two, and three bedroom apartments…

Waipapa Marae Refurbishment

Refurbishment to both Whare Nui and Whare Kai. 

MSD – Service Centres for the Future

Fit-out of office Service Centres.

14 Todd Plaza

In its former life 14 Todd Plaza, New Lynn was a redundant, abandoned former Bank of New Zealand branch building.

Digital Services Office Fit Out

The project comprised of fitting out level 5 of an existing occupied building into an open plan space including 3 high tech meeting rooms and a staff kitchen…

Knightsbridge Retirement Village Refurbishment

Works included refurbishing the reception area, dinning hall, library, lounge and bar facilities…

Lobby Refurbishment Works at Zurich House

As part of the Commercial Bay development, Precinct Properties entrusted Kalmar Interiors to fit-out the existing lobby space in the adjacent office building with the main entrance off Queen street…